The Walney Offshore Wind farm project is located 15km off Barrow in Furness in Cumbria, UK. The project consists of Walney 1 and Walney 2 each with 51 turbines. It has 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. This shot shows the yellow transition pieces, that fit onto the monopile, that holds the structure to the sea bed. The tower and turbine is then fixed onto the transition piece.

px px dpi = cm x cm = MB
Details

Creative#:

TOP16005134

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

N/A

Property Release:

N/A

Right to Privacy:

No

Same folder images:

Same folder images